Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 652 REL 27: PI 200301300 PL GRAYS RIVER WATERSED ASSESS
Project Number:
Title:
Grays River Watershed Assessment
Stage:
Closed
Area:
Province Subbasin %
Columbia River Estuary Grays 100.00%
Contract Number:
652 REL 27
Contract Title:
PI 200301300 PL GRAYS RIVER WATERSED ASSESS
Contract Continuation:
Previous: Next:
n/a
  • 652 REL 33: PI 200301300 EXP GRAYS RIVER WATERSED ASSESSMENT
Contract Status:
Closed
Contract Description:
Grays River Watershed and Biological Assessment
Statement of Work and Budget FY2005
December 2004

BPA Project Number:  2003-013-00
BPA Project Title: Grays River Watershed and Biological Assessment
Contract Number:  00000652, Release No. 00027
Contract Title:  PI 200301300 PL Grays River Watershed Assessment
Performance/Budget Period: January 1, 2005 through December 31, 2005

Technical Contact: David Geist
Staff Scientist and Project Manager
Pacific Northwest National Laboratory
Post Office Box 999, MS K6-85
Richland, Washington 99352
(509) 372-0590 (phone)
(509) 372-3515 (fax)
david.geist@pnl.gov

Contracting Contact:  Julie L. Hughes
Senior Contracts Specialist
Pacific Northwest National Laboratory
Post Office Box 999, MS K6-79
Richland, Washington 99352
(509) 372-3943 (phone)
(509) 376-9317 (fax)
julie.hughes@pnl.gov

Financial Contact: Kathy Lavender
Financial Administrator
Pacific Northwest National Laboratory
Post Office Box 999, MS K6-84
Richland, Washington 99352
(509) 376-1724 (phone)
(509) 373-1153 (fax)
kathy.lavender@pnl.gov
Account Type(s):
Expense
Contract Start Date:
01/01/2004
Contract End Date:
12/31/2005
Current Contract Value:
$697,996
Expenditures:
$654,504

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

Env. Compliance Lead:
None
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Deliverable complete A: 162. Develop and calibrate the Distributed Hydrology Soil Vegetation Model (DHSVM) 12/31/2005
Deliverable complete B: 162. Develop and calibrate Modular Aquatic Simulation System Two-Dimensional (MASS2) Hydrodynamic Model 12/31/2005
Deliverable complete C: 162. Integrate results-geomorphic, stream channel, hydro. modeling-into comprehensive watershed analysis 12/31/2005
Deliverable complete D: 157. Conduct limits analysis for depth, substrate, and velocity at representative habitat types/locations 09/30/2005
Deliverable complete E: 157. Select/describe appropriate geomorphic features/hyporheic zone characteristics in spawning areas 12/31/2005
Deliverable complete F: 162. Integrate results by comparing spawning habitat predictions to actual spawning 12/31/2005
Deliverable complete G: 119. Prepare input to Pisces Metrics 12/31/2005
Deliverable complete H: 119. Manage and Administer Projects - Produce Statement of Work and Budget for 2006 12/31/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
All Anadromous Salmonids
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 162 Develop and calibrate the Distributed Hydrology Soil Vegetation Model (DHSVM)
B 162 Develop and calibrate Modular Aquatic Simulation System Two-Dimensional (MASS2) Hydrodynamic Model
C 162 Integrate results-geomorphic, stream channel, hydro. modeling-into comprehensive watershed analysis
D 157 Conduct limits analysis for depth, substrate, and velocity at representative habitat types/locations
E 157 Select/describe appropriate geomorphic features/hyporheic zone characteristics in spawning areas
F 162 Integrate results by comparing spawning habitat predictions to actual spawning
G 119 Prepare input to Pisces Metrics
H 119 Manage and Administer Projects - Produce Statement of Work and Budget for 2006
I 185 Complete and submit August - December monthly status reports in Pisces